What Changes the Price of a Kitchen Remodel

Why two kitchens of the same size can cost very different amounts, and how to make estimates comparable.

Finished white shaker-style kitchen with stainless steel microwave and range and white countertops

Want a ballpark for your own kitchen first? Try our 60-second kitchen remodel cost estimate.

There is no honest single number for a kitchen remodel, because the price depends on what is being changed. This guide lists the factors that move the price most, so you can decide where to spend and where to save, and so every remodeler is pricing the same thing.

1. Layout changes

Keeping the sink, range and refrigerator where they are is the biggest cost lever. Moving plumbing, gas or electrical lines, removing or relocating walls, or changing window and door openings adds labor and often adds trades.

2. Cabinets

Stock, semi-custom and custom cabinets differ widely in cost and in lead time. The number of cabinets, door style, finish, interior fittings and hardware all change the total.

3. Countertops and backsplash

Material, edge profile, thickness, the number of cutouts and the square footage of backsplash all matter. Ask whether fabrication and installation are in the quote. See cabinets and countertops.

4. Appliances, ventilation and lighting

Appliance packages vary widely. A range hood vented outside, added circuits and recessed or under-cabinet lighting are separate line items to look for in a proposal.

5. Flooring and finishes

Flooring, paint, trim and wall repair are easy to leave out of a quote. Confirm what is and is not included.

6. Hidden conditions

Older plumbing, electrical that is not up to current requirements, water damage or uneven floors can show up once walls and floors are opened. Ask how unforeseen conditions are handled and priced before work starts.

7. Building and association rules

Condo and HOA requirements, work-hour limits, elevator use and permit requirements vary by building and by city. Confirm yours early. See the condo and HOA checklist.

8. Schedule and lead times

Special-order cabinets, stone and appliances can take weeks. A rushed schedule or a late selection can change the price and the finish date. See the timeline guide.

How to compare estimates

Give every remodeler the same plans, photos and selections, and ask for a written scope with inclusions, exclusions and allowances. A lower number that leaves things out is not a lower price. See what a written proposal should include.

Ready to talk about your kitchen? Request an estimate and we will walk the space and put the scope in writing.

Planning a kitchen?

Request an estimate. We reply within one business day.

Add details (optional)

We use your details only to respond to your request. See our privacy policy.

Call Now60-Second Estimate